ALLINGTON, MAIDSTONE

Customer required an additional soil stack for their new first floor bathroom. Scope of works include:

  • Cut existing underground clay pipe to add new junction in for soil stack
  • Install black Upvc 4 inch soil stack. We have also installed an access point at the bottom
  • A Shallow P trap was also installed to take existing sink and bath waste from downstairs
  • Make good and relay block paving