Larkfield, Kent

This home owner had recently bought this property and the survey had not picked up the problem with the private sewer blocking. The housing estate was built using pitch fibre pipe. The complete private sewer was replaced with plastic 110mm underground pipe If you have any forthcoming projects or would like any more information please do not hesitate to contact us on 01634 325722. Request a survey

Allington, Maidstone

New underground drainage installed for new soil stack and ground floor toilet. The new drainage had to be connected to an existing clay pipe by carefully removing the concrete surrounding the pipe Soil StackGround floor toilet connection If you have any forthcoming projects or would like any more information please do not hesitate to contact us on 01622 679744. Request a survey

Folkstone, Kent

The existing manhole had to be moved due to the new extension foundations. Permission was granted from Southern water and work was inspected on completion. If you have any forthcoming projects or would like any more information please do not hesitate to contact us on 01622 679744. Request a survey

Hassocks, West Sussex

New soakaway installed using aquacell. Total area dug out was 2.2 x 2.2 and back filled using 10mm shingle If you have any forthcoming projects or would like any more information please do not hesitate to contact us on 01622-679744. Request a survey

Allington, Maidstone

Customer required an additional soil stack for their new first floor bathroom. Scope of works include: Cut existing underground clay pipe to add new junction in for soil stack Install black Upvc 4 inch soil stack. We have also installed an access point at the bottom A Shallow P trap was also installed to take existing sink and bath waste from downstairs  Make good and relay block paving If you have any forthcoming projects or would like any more information please do not hesitate to contact us on 01622-679744. Request a survey