We provided the soft strip out of the male and female toilets at the Simon Balle school in Hertford on behalf of Brookhouseuk. Here we have removed several walls, existing ceiling which was supported by the partition wall in the center of both sets of toilets, adapted the existing 4 inch drainage to new positions and installed a new sealed recessed manhole to allow for the new flooring to be laid within.