Main wall removal with rsj isnatlaltion
Load bearing diving walls removed under mezzo floor to allow for continued access
Existing lower door removed and higher opening created using the existing lintel
Existing larger metal stairs removed using lifting plan
New structural opening made onto the new mezzanine floor, New steel column had to be installed