UTILITY TRENCH EXCAVATION, TONBRIDGE

Utility trench excavation completed in Tonbridge on behalf of FPM Facility Services from Luton. Here we have installed 2x 100mm cable ducts over 30m in length with 4 concrete bollards to protect the cables from vehicle strike. Ducting was protected with sand and backfilled with C24 concrete.