Utility trench excavation completed in Tonbridge on behalf of FPM Facility Services from Luton. Here we have installed 2x 100mm cable ducts over 30m in length with 4 concrete bollards to protect the cables from vehicle strike. Ducting was protected with sand and backfilled with C24 concrete.